Have your say on Hackney's second transport Plan

Profile image for ABattisby

By ABattisby | Friday, February 11, 2011, 17:28

Local residents, businesses, community groups and partners are invited to have their say on Hackney Council's traffic and transportation plans for the next three years.

All London boroughs are required to prepare a Local Implementation Plan outlining their proposals to implement the London Mayor’s Transport Strategy (MTS) locally.

Hackney Council has prepared a plan that details how its traffic and transportation programmes will contribute to meet the London wide transport targets in the long term, and includes a proposed programme of investment from 2011 until 2014. 

The draft plan, called LIP 2, includes projects like improvements to town centres and public spaces, new cycling facilities, safer roads and measures to smooth traffic flow in Hackney. 

Councillor Feryal Demirci, Cabinet Member for Neighbourhoods, said: “We want to ensure that the second Local Implementation Plan helps deliver an efficient, sustainable transport system that will connect and integrate Hackney with the rest of London and beyond. This will enable easy access to economic, social and cultural opportunities both locally and London wide. It is essential that we hear from local people, businesses, community groups and other stakeholders to ensure they are involved in its preparation.”

The Council wants feedback on the proposed targets and challenges in the draft LIP, but also welcome opinions on other aspects of the document. 

Comments received will be considered as part of the production of the final LIP, which will be produced by summer 2011. The document will then be submitted to the Mayor of London for approval.

The consultation is open to the public and will close on Friday 06 May 2011.

How to have your say: 

On the web - you can see the full LIP document and related studies, and complete the online questionnaire, at: www.hackney.gov.uk/streetscene-LIP 

By email or post - download the LIP questionnaire (PDF, 214KB) and return your response by either email to: consultation@hackney.gov.uk or by post to: 

LIP 2 Consultation, Freepost 18819, Consultation Team, London Borough of Hackney, Mare Street, E8 1EA. 

Stakeholder workshop - for Hackney and London based organisations with an interest in transport issues in the borough. Attend a short and focused session to discuss the plans and network on Wednesday 02 March 2011, 10am-12noon, at Assembly Hall, Hackney Town Hall, Mare Street, London E8 1EA. Places are limited, to book a space email: consultation@hackney.gov.uk 

For more information about the consultation, including requests for translated versions, please contact the Traffic and Transportation team on 020 8356 4891; email: consultation@hackney.gov.uk; or visit the LIP2 consultation page: www.hackney.gov.uk/streetscene-LIP

Photo courtesy of satguru/Flickr 

      

Comments

       
max 4000 characters
        
   

Latest Stories in Dalston

       
      

Local Jobs

       
   

Search for...

       
        
Min price is bigger than Max price
        
Min price is bigger than Max price
        
Min rent is bigger than Max rent